Tuesday, March 25, 2014

A roof, windows, doors, plumbing and more!

So many things have been happening at the house. The roof is finally on and looks great. We love the texture and color. Don't mind the arch....this was a mistake and we can't wait for it to be fixed.

The front door arrived and should be installed soon...and look at all of those pipes for plumbing. 

This is where the mud room sink will be. 

This is the kitchen, the two islands and nook. If you look closely you can see the can lights in the ceiling. 

Fireplaces are in. It looks so little in this ginormous room...I was worried when I saw this that I shouldn't have put the fireplace so low but hopefully with the stone, mantle and TV it will all look proportionate. :)

LOVE my french doors....can't wait to entertain in this room and on the deck. 



Some more plumbing in the wall and electrical. 

A look at the master bedroom sitting area. 

And a huge fireplace in the master....yikes this one seems to big and the one downstairs too small...not much we can do now so hopefully it will all work out and look great. 

Master bedroom windows. 

Master bath plumbing. 

The tub. 

Upstairs hall. 

Kids bath plumbing. 

Downstairs rec room. 

Richie had to move all 93 :) of these deck boards down the hill because the water meter was being dug, set and installed and they were in the way. He was a little tired after this hard labor. 


We met with the siding guy...the siding will be dropped tomorrow, we've been working on picking floors (of course the option is love is outrageously priced), are thinking about paint colors, picked out a garage door, are working on getting the cabinet bids in line and hopefully ordered the end of next week, are working on tile this weekend....oh the things. We are just a little busy but it all seems to be going well.



No comments:

Post a Comment